General Electric Combined Cycle Power Plant Cap. 125 MW
SKU : EMT2110
Stock No: EMT2110
Brand: GENERAL ELECTRIC
POWER PLANT SPECIFICATION
The Power Plant’s total installed power is 125 MWh, total yearly production capacity is 1.033 GWh.
General Electric :
Model 1 LM6000 PC Sprint CNG + Liquid (Naphtha) Manufactured Date 2004 Running Hours 50.900 Over-haul 13.04.2012 After Over-haul Running Hours 11.140 Model 2 LM6000 PC Sprint CNG Manufacturer Date 2010 Running Hours 17.785 Steam Turbine :
Capacity 1 x 27.3 MWh Brand SIEMENS Manufactured Date 2001 Running Hours 86.150 Over-haul 01.07.2013 After Over-haul Running Hours 6.455 Air Cooled Condenser System :
Steam coming from the steam turbine condensed and collected in condensate tank and sent to the boiler back.